Laura M Perez and Associates, Inc. (LMP) was responsible for the design, permitting, and construction administration services for Chapman Field Park. The Pedestrian/Bike Path access road extends ¾miles into the park using one bridge to cross the water way. The Canoe Pier and Launching Dock was designed using a floating dock system inorder for the dock to undulate with the tide. The Floating Dock system allows for ADA canoe launching capability.
New Scope of Work:
• The new pedestrian/bicycle path
• Access road
• Bridge
• Canoe Pier/Launching Dock
• Parking Lot
Client: Miami-Dade County Parks and Recreation
Location: Miami, Florida
Project: Pedestrian/Bike Path & Canoe Dock
Completion: November 2011
Cost: Total cost 1.2 million